Refer the following table to answer these questions.
The percentage increase in hydel capacity over that of the previous year was maximum in
In 2000, the percentage share of nuclear power in the total power capacity installed was approximately
If the total power generated in thermal units be 40% of the installed capacity, in hydel units be 50% of the installed capacity and in nuclear be 90% of the installed capacity, the total power generation in 1998 would be
In 1990, the percentage share of thermal in total installed capacity was approximately
The growth in the installed thermal capacity between 1991 and 1999 was approximately
The following table refers to hotel construction projects. The cost of the project increased at the rate of 10% per annum; if completed beyond 1997.
What is the approximate cost incurred (in Rs. crore) for projects completed by 2000?
Which of the following has the maximum number of rooms per crore of rupees?
What is the cost incurred (in Rs. crore) for projects completed in 1998?
What is the cost incurred (in Rs. crore) for projects completed in 1999?