The following table refers to hotel construction projects. The cost of the project increased at the rate of 10% per annum; if completed beyond 1997.

IHCL: 600/275 = 2.18
Raheja Group:500/250 = 2
Lokhandwala Group: 536/225 = 2.38
ITC:300/300 = 1
So Lokhandwala Group is the answer.