The following table refers to hotel construction projects. The cost of the project increased at the rate of 10% per annum; if completed beyond 1997.
For year 1999:
Total value = IHCL + Leela hotel + Raheja + ITC
Total value = 275+235+250+300 = 1060
Required value = 1.1 * 1.1*1060 { since increase of 10% over 1998 and 1997]
= 1282.6
Hence A