Edit MetaData
Educational materials for IPMAT and IIMB UG preparation
Educational materials for JEE preparation
3 months, 1 week ago
3 weeks ago
The best way to solve this is by LCM method
Consider the LCM or any number that is divisible by all three days to be the total work
For example here let's assume 120 to be the total work as it is divisible by 24,6 and 12.
Now if we divide 120 by all these numbers we get the power of abc as 5,20,10 respectively.
To find out the time required by all three we divide 120 by (5+20+10) which is the power of all three.
The time required is 120/35 or 24/7 days
Hope this helps
Day-wise Structured & Planned Preparation Guide
By proceeding you agree to create your account
Free CAT Schedule PDF will be sent to your email address soon !!!