ISRO Scientist or Engineer Architecture 2018

Instructions

For the following questions answer them individually

Question 31

Pick up the incorrect statement from the following

Video Solution
Question 32

In chain surveying, the field work is limited to

Video Solution
Question 33

A UNESCO world heritage site “Alhambra” is classified example of

Video Solution
Question 34

The set of entities representing vector data type in Geographic Information System (GIS) is

Video Solution
Question 35

For earth quake resistant buildings what should be the type of foundation for concrete and masonry buildings

Video Solution
Question 36

The compressive strength of concrete decreases with

Video Solution
Question 37

In steel structures purlins are generally placed at the panel point so as to avoid

Video Solution
Question 38

An rcc lintel is spanning an opening of 2.5 m span in brick wall. The height of the opening is 2.5 m above the floor level and the height of the room is 3.6 m above the floor level. The rcc lintel is to be designed for

Video Solution
Question 39

In steel structures, the most economical section for a steel column is

Video Solution
Question 40

Shell structures does not have any

Video Solution
cracku

Boost your Prep!

Download App