XAT 2025 Three-week batch starts today. Enroll in crash course by Sayali ma'am (XAT 99.998%iler)
Edit MetaData
For the following questions answer them individually
Plywood has the advantage of
Same tensile strength in all directions
Greater tensile strength in longer direction
Greater tensile strength in shorter direction
None of the above
The brick work is not measured in cubic metre in the case of
Reinforced brick work
Half brick wall
Brick work in arches
Brick work in foundation
The load bearing capacity of a water logged soil can be improved by
Increasing the depth of the foundation
Grouting
Compacting the soil
Draining the soil
Which of the following statements regarding project management is true?
Crash cost depends upon the variance of the activity to be crashed
Both PERT and CPM require that net work tasks have un changing durations
Shortening the project by assigning more resources to one or more of the critical tasks is called project crashing
Crashing need not consider the importance of crashing an activity on other parts in the network
Which of the following is the advantage of the bar chart?
Uncertainties
Inter dependencies of activities
Project progress
In Critical Path Method total float for any activity is defined as the difference between
Its latest start time and earliest finish time
Its latest start time and earliest start time
Its earliest finish time and its earliest start time for its successor activity
Its latest finish time and earliest start time for its successor activity
The entrained concrete is used in lining walls and roofs for making them
Sound insulated
Damp proof
Structurally sound
The angular steps used for changing direction of the stairs are called
Winders
Radial steps
Angular steps
Round steps
Pick up the incorrect statement from the following
No timbering is required for the shallow trenches
Shallow foundations can be constructed on made up soil
Grillage foundations is classified as a shallow foundation
Black cotton soil is very good for foundation bed
In building estimation, the trapezoidal formula for calculating volumes is based on the assumption that
The mid area of a pyramid is equal to area of the ends
The end sections are non parallel planes
The volume of the prismoidal is over estimated and hence a prismoidal correction is applied
Login to your Cracku account.
Enter Valid Email
Follow us on
Incase of any issue contact support@cracku.in
Boost your Prep!
Quick, Easy and Effective Revision
By proceeding you agree to create your account
Free CAT Formulae PDF will be sent to your email address soon !!!
Join cracku.in for Expert Guidance.