Question 166

A glass factory hires 11 craftsmen by paying each of them Rs 1100 per day. The 12th craftsman demands Rs 1200 per day. If this craftsman is hired then all other craftsmen must be paid Rs 1200. The marginal resource (labour) cost of the 12th craftsman is ___________.


Create a FREE account and get:

  • Free SSC Study Material - 18000 Questions
  • 230+ SSC previous papers with solutions PDF
  • 100+ SSC Online Tests for Free

cracku

Boost your Prep!

Download App