Question 1

Two pipes can fill up a tank respectively in 3 hours and 6 hours and a third pipe can empty a tank in 9 hours. If three of them are working together then how long will it take to fill up the tank?

Show Answer Explanation

Question 2

Two taps A and B can fill a tank individually in 6 hours and 8 hours respectively and tap C can empty the same tank in 12 hours. If all the taps are kept open, how many hours would it take to fill the tank?

Show Answer Explanation

Question 3

Two persons A and B can complete a piece of work in 10 days and 20 days respectively. Together, they start working on the project, but A left after 4 days. How long more will B take to complete the project?

Show Answer Explanation

Question 4

A car covers a distance from town A to town B at the speed of 58 kmph and covers the distance from town B to town A at the speed of 52 kmph What is the approximate average speed of the car?


Question 5

A person travels the first 100km of his journey at 25km/hr and the next 200km at 40km/hr. Find the average speed of a person during his entire journey.

Show Answer

Question 6

Two trains A and B are going in the same direction with the speeds of 20 km/h and 15 km/h respectively. If the starting point of B is 200 km ahead from the starting point of A, how long will it take A to meet with the train B?


Question 7

A 400 m long train can cross a pole in 10 seconds. Find the time that this train will take to overtake a train of length 300m which is running at the speed of 72 km/hr in the same direction as that of the first train?


Question 8

An empty tank has three inlet and two outlet pipes connected to it. An inlet pipe can fill an empty tank in 12 hours, while an outlet pipe can drain a filled tank in 10 hours. All inlet pipes have the same efficiency and both outlet pipes have the same efficiency. If all inlet pipes and outlet pipes connected to the empty tank are opened together, find the time in which the tank is completely filled.


Question 9

A task is completed in a unique manner: on the first day, one man works; on the second day, two men work; on the third day, three men work, and so on, until the task is finished in 15 days. The same task is then assigned to women, who are known to be 40% as efficient as men. Following the same pattern, calculate the number of days required for the women to complete the task. (Round up to the nearest integer.)


Question 10

P, Q, and R can complete a task in 10, 15, and 20 days, respectively. P and Q start working on the task together, and after 3 days, R joins, and P leaves. If they work together for 3 more days, what fraction of the task is left to be completed?


Question 11

Ravi and Raju started from a same point on a circular track in opposite direction. They met at 11 distinct points. Had they travelled in same direction they would have met at 5 distinct points. If Raju who is fastest amoung two, can travel 1200m in 15 sec, then in what time can Ravi travell the same distance?


Question 12

Anuj and Bharat start running towards each other simulatenously, starting from points P and Q, respectively. They meet somewhere in between and continue on their journeys to Q and P, respectively. Anuj reaches Q 4 hours after meeting Bharat. Given that it took Anuj 10 hours to reach Q from P, how much time did Bharat take to reach P from Q?


Question 13

A train takes 20 seconds to cross a pole. It crosses a platform 1000 meters long in 100 seconds. What is the train's speed?


Question 14

A train starts from Mumbai towards Bengaluru at a speed of 80 kmph. After half an hour, another train from Bengaluru starts running towards Mumbai at a speed of 100 kmph. Find the distance travelled by the slower train when both the trains meet if the distance between Mumbai and Bengaluru is 940 kms.

MAH MBA CET 2024 Speed Time Distance Work questions

Question 1

Three pipes A, B and C are connected to a tank. Out of the tree, A and B are tile inlet pipes and C is the outlet pipe If opened separately, A fills the tank in 10 hours and B fills the tank in 30 hours. If all three are opened simultaneously, it takes 30 minutes extra than if only A and B are opened. How much time does it take to empty the tank if only C is opened?


Question 2

DIRECTION for the question: Solve the following question and mark the best possible option.

David and Michael together can finish a job in 4 days 19 hrs 12 min. If David works at two-thirds Michael's speed, how long does it take Michael alone to finish the same job?


Question 3

Time required by two pipes A and B working separately to fill a tank is 36 seconds and 45 seconds respectively. Another pipe C can empty the tank in 30 seconds. Initially, A and Bare opened and after 7 seconds, C is also opened. In how much more time the tank would be completely filled?


Question 4

The distance from Y to Z is thrice that from X to Y. Two trains A and B travel from X to Z via Y The speed of train B is double that of train A while traveling from X to Y and their speeds are interchanged while traveling from Y to Z. The ratio of the time taken by train A to that taken by train B in traveling from X to Z is?


Question 5

A train passes a station platform in 36 seconds and a man standing on the platform in 20 seconds If the speed of the train is 54 km/hr what is the length of the platform? (in m )


Question 6

DIRECTION for the question: Solve the following question and mark the best possible option.

A jogger running at 9 kmph alongside a railway track is 240 meters ahead of the engine of a 120 metre long train running at 45 kmph in the same direction. In how much time will the train pass the jogger?

MAH MBA CET Quant Questions | MAH MBA CET Quantitative Ability

MAH MBA CET Simple Interest Compound Interest QuestionsMAH MBA CET Linear Equations QuestionsMAH MBA CET Percentages QuestionsMAH MBA CET Algebra QuestionsMAH MBA CET Quadratic Equations QuestionsMAH MBA CET Mensuration QuestionsMAH MBA CET Number Systems QuestionsMAH MBA CET Number Series QuestionsMAH MBA CET Profit And Loss QuestionsMAH MBA CET Progressions and Series QuestionsMAH MBA CET Time And Work QuestionsMAH MBA CET Arithmetic QuestionsMAH MBA CET Averages, Ratio and Proportion QuestionsMAH MBA CET Coordinate Geometry QuestionsMAH MBA CET Time Speed Distance QuestionsMAH MBA CET Logarithms QuestionsMAH MBA CET Time, Speed and Distance QuestionsMAH MBA CET Venn Diagrams QuestionsMAH MBA CET Averages QuestionsMAH MBA CET Functions, Graphs and Statistics QuestionsMAH MBA CET Data Sufficiency QuestionsMAH MBA CET Geometry QuestionsMAH MBA CET Inequalities QuestionsMAH MBA CET Remainders QuestionsMAH MBA CET Averages Mixtures Alligations QuestionsMAH MBA CET Miscellaneous QuestionsMAH MBA CET Profit and Loss QuestionsMAH MBA CET Logarithms, Surds and Indices QuestionsMAH MBA CET Probability, Combinatorics Questions

MAH MBA CET DILR Questions | LRDI Questions For MAH MBA CET

MAH MBA CET Table based DI Sets QuestionsMAH MBA CET Routes And Networks QuestionsMAH MBA CET DI Miscellaneous QuestionsMAH MBA CET Data change over a period QuestionsMAH MBA CET Selection With Condition QuestionsMAH MBA CET Maxima-Minima QuestionsMAH MBA CET Quant Based LR QuestionsMAH MBA CET Data Interpretation Basics QuestionsMAH MBA CET Arrangement QuestionsMAH MBA CET Coins and Weights QuestionsMAH MBA CET 2D & 3D LR QuestionsMAH MBA CET Data Interpretation QuestionsMAH MBA CET Scheduling QuestionsMAH MBA CET Charts QuestionsMAH MBA CET Quant Based DI QuestionsMAH MBA CET Miscellaneous LR QuestionsMAH MBA CET Special Charts QuestionsMAH MBA CET Games and Tournamnents QuestionsMAH MBA CET Venn Diagrams QuestionsMAH MBA CET Puzzles QuestionsMAH MBA CET DI with connected data sets QuestionsMAH MBA CET Truth Lie Concept Questions

MAH MBA CET Verbal Ability Questions | VARC Questions For MAH MBA CET

cracku

Boost your Prep!

Download App