Starts today (1st July) ๐ Join CAT 2025 Intensive 150-Day Batch by a 5-time 100%iler now
Edit MetaData
Based on the recommendations of the Indian Road Congress (IRC) for CBR method of design of pavement. identify the incorrect statement.
CBR tests should be performed on remoulded soils in the laboratory.
In case of new constructions, the CBR test samples may be soaked in water for four days before testing.
In case of existing roads. sample should be compacted to the field density of sub-grade soil (at OMC or at the field moisture content)
At least five samples should be tested on each type of soil at the same density and moisture content.
Create a FREE account and get:
Login to your Cracku account.
Enter Valid Email
Follow us on
Incase of any issue contact support@cracku.in
Boost your Prep!
Day-wise Structured & Planned Preparation Guide
By proceeding you agree to create your account
Free CAT Schedule PDF will be sent to your email address soon !!!
Join cracku.in for Expert Guidance.