Instructions

Give an input, a machine generates pass codes for the six batches each day as follows:
Pass Codes:
Batch I: from sea the out taken were icons these
Batch II: from icons these were taken out the sea
Batch III: from icons out sea the taken were these
Batch IV: from icons out sea these were taken them and so on.
First batch starts at 10.00 a.m. and each batch is for one hour. There is a rest period of one hour after the end of the fourth batch.

Question 43

The pass code for the first batch on a day was ‘he so used to sell the surplus items’.
What was the input on the day ?

It is not possible to determine the input from any given step, as we don't know the specific positions of any word.

Thus, cannot be determined.

Was this solution helpful?

Get AI Help

Create a FREE account and get:

  • Banking Quant Shortcuts PDF
  • Free Banking Study Material - (15000 Questions)
  • 135+ Banking previous papers with solutions PDF
  • 100+ Online Tests for Free

Join CAT 2026 course by 5-Time CAT 100%iler

Start your IIM journey with the right preparation and crack CAT 2026.

Ask AI