Last 7 Months to CAT 2024 🥳 Mega Discount of Upto 65% Today. Enroll now
2 years, 9 months ago
A man covers a certain distance on scooter. Had he moved 3km/h faster he would have taken 40min less. If he had moved 2km/h slower, he would have taken 40min more. The distance is? (a)42.5km (b) 36km (c) 37.5km (d) 40km {reply with solution}
ABCD is a cyclic quadrilateral the tangent to the circle at the point a and c on it intersect at p if angle ABC 98 degree then what is the measure of angle abc
Whats the Level of DashCAT-3? is it easier than actual CAT or on par?
The radius of a spherical ballon, of 30units , increases at the rate of 2units per second. then it's curved surface area increase by?
the answer is given as 480pie sq units/sec.
but for spheresfor r=30, CSA= 3600pie sq units. after 1sec, for r=32, CSA = 4096pie sq units. so, change in CSA = 496pie sq units/sec. why is this wrong?
how to prepare for the interview
as there are already 3 free mocks , if I take pack of mocks i.e 15 what I'll be expecting 3+12 or 3free+15 paid mocks???
Study the following information to answer the given questions: A*B means A is not greater than B A%B means A is not greater than or equal to B A&B means A is not smaller than B A#B means A is not smaller than or equal to B A@B means A is not greater than or smaller than B
Statements: Y*T&V@X*J%M#P Conclusions: I. P % T II.M & X
Only I is follow Only II is follow Either I or II follow Neither I nor II follow Both I and II are follow
Study the following information to answer the given questions: A*B means A is not greater than B A%B means A is not greater than or equal to B A&B means A is not smaller than B A#B means A is not smaller than or equal to B A@B means A is not greater than or smaller than B Statements: Y*T&V@X*J%M#P Conclusions: I. P % T II.M & X Only I is follow Only II is follow Either I or II follow Neither I nor II follow Both I and II are follow
hi
When they work alone, B needs 25% more time to finish a job than A does. They two finish the job in 13 days in the following manner: A works alone till half the job is done, then A and B work together for four days, and finally B works alone to complete the remaining 5% of the job. In how many days can B alone finish the entire job?
please verify your phone number with TrueCaller to get more updates from cracku
Boost your Prep!