Sign in
Please select an account to continue using cracku.in
↓ →
The following table is based on the work record of 8 workers β L, M, N, O, P, Q, R and S who are working under the supervision of Gopinath on the $$30^{th}$$ September.
A = Talking informally
B = Working sincerely
C = Pretending to work
D = Sitting idle
E = Discussing about work
F = Not at work place
G = Disturbing others
The management allocated points for the workers as follows :
A = -2 : B = 5; C = 1 ; D = 0; E = 4; F = -3; G = 4
The sum of the points of all the workers at a specific time is called the efficiency at that time, then at which of the following times of the day was the efficiency the lowest on September $$30^{th}$$
Let us fill in the points received by each worker by management at each time.
We know A = -2 : B = 5; C = 1 ; D = 0; E = 4; F = -3; G = 4
Take the total points received by each worker on 30th September and the total points received by all workers combined at a particular time.
The sum of the points of all the workers at a specific time is called the efficiency at that time, then at which of the following times of the
Educational materials for CAT preparation
Ask our AI anything
AI can make mistakes. Please verify important information.
AI can make mistakes. Please verify important information.