Question 148

A 45 cm diametre well penetrates an unconfined aquifer of 30 m thick. Under the
steady pumping rate for a long time, the drawdown’s at two observation
wells 10 m and 20 m from the pumping well are 5 m and 3.5 m respectively. What will be the
discharge (cubic metre), if the permeability of the aquifer is given as 20
m/day?

Create a FREE account and get:

  • Free SSC Study Material - 18000 Questions
  • 230+ SSC previous papers with solutions PDF
  • 100+ SSC Online Tests for Free

Join CAT 2026 course by 5-Time CAT 100%iler

Crack CAT 2026 & Other Exams with Cracku!

Ask AI

Ask our AI anything

AI can make mistakes. Please verify important information.