Akash, Bhanu and Sam work on a project. After they complete 1/4th of the project, Sam takes a break For 7 days only Akash and Bhanu work on the project. After that Sam relieves both of them. He completes the project in five more days. Bhanu works 50% faster than Akash and Sam alone can finish the entire project in 20 days. How long would Bhanu take to finish the entire project? a) 25 days D) 23 1/3 days c) 21 days d) 22 1/2 days

1

Rohan Honale 1y ago

work done by Akash be A work done by Bhanu is 1.5A Work done by Sam is 1/20 units when A, B and S work together, A+1.5A+1/20 = 1/4 2.5A + 1/20 = 1/4 work done A and B in 7 days, 2.5A x 7 = 17.5 A work done by sam in 5 days, 1/20 x 5 = 1/4 therefore, total work is, 1/4+17.5A+1/4 = 1 Therefore A = 1/35 B's rate becomes 1.5 x 1/35 i.e. 3/70 therefore b will take 70/3 days i.e. 23.33 days.