SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 11


The height of the sink of wash basin above floor level is kept _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 12


Pick up the correct statement from the following

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 13


If the formation level of a highway has a uniform gradient for a particular length and the ground is also having a longitudinal slope, the earthwork may be calculated by _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 14


The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 15


A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The cubic content of concrete (1:2:4) for the road specified in is _____

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 16


The cross-sectional area of the embankment of a canal fully in embankment,(refer the figure given below) is:-

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 17


The following item of earthwork is not measured separately _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 18


Pick up the incorrect statement from the following _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 19


While estimating a reinforced cement structure the omitted cover of concrete is assumed _____.

Video Solution

SSC JE Civil Engineering 2nd March 2017 Shift-2 - Question 20


For 100 sq. m cement concrete (1:2:4) 4 cm thick floor, the quantity of cement required is _____

Video Solution