SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 51


For the water is flowing through a 20 cm diameter pipe with friction factor, f = 0.04. The flow will be _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 52


Crude oil of kinematic viscosity 2.25 stokes flows through a 20 cm diameter pipe, The rate of flow being 1.5 litres/sec. The flow will be _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 53


The maximum continuous power available from a hydroelectric plant under the most adverse hydraulic conditions is known as _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 54


A plot between power generated in MW and time is known as _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 55


The ratio of 'Average generation in KWH per year' to 'the product of Installed capacity in KW and hrs per year' is known as _____.
A. Plant factor
B. Capacity factor
C. Use factor

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 56


Portion of the installed reserve kept in operable condition but not placed in service to supply the peak load is known as _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 57


Capacity of hydroelectric plant in service in excess of the peak load is known as _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 58


An impulse turbine is used for _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 59


In a reaction turbine, the draft tube is used _____.

Video Solution

SSC JE Mechanical Engineering 3rd March 2017 Shift-2 - Question 60


In an inward flow reaction of turbine _____.

Video Solution