Question 111

What percentage of the cost of the estimate is provided for the tools and plants?

Video Solution
Question 112

What is the thickness (cm) of a two brick wall made up of standard modular brick?

Video Solution
Question 113

The expected out turn (cubic metre) of reinforced brickwork per mason per day is _____.

Video Solution
Question 114

A canal bank has a length of 100 m and its height at two extreme ends is 2 m and 3 m respectively. The side slope of the bank is 2 : 1. The rate of pitching is Rs. 500 per square metres. Calculate the cost (Rs.) of pitching of the area of the side slope.

Video Solution
Question 115

Calculate the volume (cubic metre) of the dry mortar required for 1 cubic metre brick work.

Video Solution
Question 116

Which of the following is a factor for obsolescence of the property?

Video Solution
Question 117

Calculate the years purchase for a property of useful life of 30 years and rate of interest of 5% per annum. The rate of interest for sinking fund is 3%.

Video Solution
Question 118

The expression for the total volume of earthwork for an embankment using Simpson's one third rule, if $$A_1, A_2, A_3, A_4, ........, A_{n - 1}$$ and $$A_n$$ are the areas at n sections at an interval of h is ..............

Video Solution
Question 119

Which of the following quantity is measured using a Planimeter?

Video Solution
Question 120

The inside wall of a septic tank is finished with 12 mm cement plaster with 1 : 4 cement mortar. Calculate the quantity of the cement (cubic metre) required, if the size of the septic tank is 6 m $$\times$$ 4 m $$\times$$ 2 m.