Question 111

Accuracy in the measurement of the volume in cubic meter should be near to ____.

Video Solution
Question 112

Deduction for total length of the central line at the corner where two walls meet is ______.

Video Solution
Question 113

Which of the following is estimated by using a bar bending schedule?

Video Solution
Question 114

Which of the following is measured in square meter?

Video Solution
Question 115

Which of the following statements are the CORRECT for estimation of plastering?
1) For opening up to 0.5 square meters, no deduction is made.
2) For opening exceeding 0.5 square meters and up to 3 square meters, deduction is made for one face.
3) For opening up to 3 square meters, deduction is made for both faces.
4) For ends of beams, no deduction is made.

Video Solution
Question 116

Chowkhat or frame of the door is measured in_________.

Video Solution
Question 117

Calculate the preliminary estimate for a building having a total carpet area of 500 square meters. Extra provision as 10% of the carpet area is provided for walls and verandah. The plinth area rate is Rs. 1,200 per square meter.

Video Solution
Question 118

Calculate the volume of earth work for an embankment of length L and width B. The mean depth of the embankment is D and side slope is S : 1.Using mid-sectional area method.

Video Solution
Question 119

Calculate the quantity of the sand required for 8 cubic meter brick work with cement mortar (1 : 3).

Video Solution
Question 120

Calculate the capitalized value of a building having annual rent of Rs. 20,000 and highest rate of interest is 5%.

Video Solution