SSC JE Civil Engineering 22nd Jan 2018 Shift-2

Instructions

For the following questions answer them individually

Question 111

Which of the following is the CORRECT statement for length of the short wall, as one move from earthwork to brick work in super structure in long and short wall method?

Video Solution
Question 112

Which of the following is the unit of measurement for rivets?

Video Solution
Question 113

Which of the following statement is CORRECT for units of measurement?

Video Solution
Question 114

Which of the following area is NOT included in the plinth area of the building?

Video Solution
Question 115

Which of the following multiplying factor is used for the estimation of lead for Cartze tracks?

Video Solution
Question 116

Threading in the iron is measured in _____.

Video Solution
Question 117

Calculate the cost (Rs.) of 100 mm thick brick lining of a septic tank of size 5 m x 3 m x 1.5 m, if the rate of lining is Rs. 200 per square meter.

Video Solution
Question 118

Calculate the annual percentage depreciation of a machine using the constant percentage method, if purchasing cost is Rs. 12,000 and scrap value is Rs 3,000 and the life of the machine is 8 years.

Video Solution
Question 119

The number of the bricks delivered by an unskilled labour to a distance of 10 m in a working day is approximately _____.

Video Solution
Question 120

Calculate the quantity (cubic meter) of fine aggregate required for construction of a circular water tank of 3.5 m diameter and 5 m height, if M 25 cement concrete is used

Video Solution
cracku

Boost your Prep!

Download App