SSC JE Civil Engineering 2013

Instructions

For the following questions answer them individually

SSC JE Civil Engineering 2013 - Question 121


The Whole circle Bearing of a line is $$287^\circ 15'$$. The Reduced Bearing of the lime is

Video Solution

SSC JE Civil Engineering 2013 - Question 122


A line joining some fixed points on the main survey lines is called

Video Solution

SSC JE Civil Engineering 2013 - Question 123


Which of the following methods of contouring is most suitable for hilly terrian?

Video Solution

SSC JE Civil Engineering 2013 - Question 124


The angle between true meridian and the magnetic meridian at the time of observations is known as

Video Solution

SSC JE Civil Engineering 2013 - Question 125


‘Offsets’ are

Video Solution

SSC JE Civil Engineering 2013 - Question 126


The fore bearings of the lines AB and BC are $$40^\circ and 120^\circ$$ respectively. The included angle between AB and BC is

Video Solution

SSC JE Civil Engineering 2013 - Question 127


If the sum of northing of a traverse exceeds the sum of southing by 1 m and sum of easting exceeds the sum of westings by 1 m, the resultant closing error and its true
bearing are respectively

Video Solution

SSC JE Civil Engineering 2013 - Question 128


If in a closed traverse, the sum of the north latitudes is more than the sum of the south latitudes and also the sum of west departures is more than the sum of east departures,
the bearing of thew closing line is in the

Video Solution

SSC JE Civil Engineering 2013 - Question 129


A 300 mm square bearing plate settles by 15 mm in a plate load test on a cohesive soil when the intensity of loading is 0.2 N/mm2 . The settlement of a prototype shallow footing 1 m square under the same intensity of loading is

Video Solution

SSC JE Civil Engineering 2013 - Question 130


The specific speed for a turbine has the dimensions of

Video Solution
cracku

Boost your Prep!

Download App