Question 111

What is the unit of measurement for steel reinforcement?

Video Solution
Question 112

What is the weight (in kg) per meter length for 12 mm diameter steel bar?

Video Solution
Question 113

What percentage of the total cost is added in the cost of construction for contingencies?

Video Solution
Question 114

What percentage of total cost is added to the schedule of rates of the public work department for over-head cost?

Video Solution
Question 115

For estimation of painting area of corrugated sheets, percentage increase in area above the plain area is ____.

Video Solution
Question 116

Central line method for estimation is suitable for_______

Video Solution
Question 117

Deduction at the L-junction of wall for total length of the central line is ______________.

Video Solution
Question 118

Calculate the quantity of the cement required in cubic meter for 10 square meters of cement plaster 12 mm thick using cement mortar of 1:6.

Video Solution
Question 119

Calculate the quantity of the earthworks in cubic meter for a canal embankment of 100 m long having heights of 3 m and 5 m at the two extreme edges. Top widths of the embankment are 2 m and 4 m at the two extreme edges and side slope is 2: 1. Use trapezoidal method.

Video Solution
Question 120

Calculate the primary estimate including contractor’s profit in rupees for the building having a plinth area of 1,500 square meters and a rate of Rs. 2,000 per square meter.

Video Solution