SSC JE Civil Engineering 24th Jan 2018 Shift-2

Instructions

For the following questions answer them individually

Question 111

Explosive required for blasting is measured in

Video Solution
Question 112

Which of the following is the correct statement for length of the long wall as one move from earthwork to brick work in super structure in long and short wall method?

Video Solution
Question 113

Calculate an approximate estimate (Rs.) of the building with total plinth area of the building is 500 square meters. The rate of the plinth area is Rs. 3,000 per square meters. The costs of the water supply and contingencies are 7% and 5% of cost of construction respectively.

Video Solution
Question 114

Calculate the cost of the plastering required for a wall of 4 m long, 3.5 m high and 300 mm thick, if the rate of plastering is Rs. 12 per square meter.

Video Solution
Question 115

Which of the following is the unit of measurement for the sills of windows?

Video Solution
Question 116

Which of the following area is included in the plinth area of the building?

Video Solution
Question 117

Which of the following method is used for estimation of depreciation of building?

Video Solution
Question 118

Capitalized value of a property is the product of_________________.

Video Solution
Question 119

Calculate the total quantity (cubic meter) of the coarse aggregate required for an isolated rectangular footing of size 3 m x 2 m, if 1 : 2 : 4 cement concrete is used. The depth of the footing is 600 mm.

Video Solution
Question 120

What is the actual size (mm) of the standard modular brick as per Indian Standards?

Video Solution
cracku

Boost your Prep!

Download App