For the following questions answer them individually
Explosive required for blasting is measured in
Which of the following is the correct statement for length of the long wall as one move from earthwork to brick work in super structure in long and short wall method?
Calculate an approximate estimate (Rs.) of the building with total plinth area of the building is 500 square meters. The rate of the plinth area is Rs. 3,000 per square meters. The costs of the water supply and contingencies are 7% and 5% of cost of construction respectively.
Calculate the cost of the plastering required for a wall of 4 m long, 3.5 m high and 300 mm thick, if the rate of plastering is Rs. 12 per square meter.
Which of the following is the unit of measurement for the sills of windows?
Which of the following area is included in the plinth area of the building?
Which of the following method is used for estimation of depreciation of building?
Capitalized value of a property is the product of_________________.
Calculate the total quantity (cubic meter) of the coarse aggregate required for an isolated rectangular footing of size 3 m x 2 m, if 1 : 2 : 4 cement concrete is used. The depth of the footing is 600 mm.
What is the actual size (mm) of the standard modular brick as per Indian Standards?