Which one of the following method is used for the approximate estimation?

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 112


Accuracy in the measurement of the thickness of the slab or sectional dimension of column and beam (in centimetre) should be _____.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 113


Deduction at T-junction of the wall for total length of the central line is .................

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 114


For estimation of painted area of semi corrugated asbestos cement sheets, percentage increase in area above plain area is _____.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 115


Scrap value of a property may be _____.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 116


What is the unit of measuring cornice?

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 117


Calculate the number of bricks in 20 cubic metres brick works.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 118


Calculate the area (square metre) of the formwork required for a beam of 2 m span and cross section dimension of 400 mm $$\times$$ 200 mm.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 119


The cross section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.

Video Solution

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 120


Calculate the annual depreciation (Rs.) of a machine having initial cost of Rs. 10,000. The scrap value is Rs. 1,000 and useful life of 30 years.