SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 111


Which one of the following method is used for the approximate estimation?

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 112


Accuracy in the measurement of the thickness of the slab or sectional dimension of column and beam (in centimetre) should be _____.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 113


Deduction at T-junction of the wall for total length of the central line is .................

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 114


For estimation of painted area of semi corrugated asbestos cement sheets, percentage increase in area above plain area is _____.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 115


Scrap value of a property may be _____.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 116


What is the unit of measuring cornice?

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 117


Calculate the number of bricks in 20 cubic metres brick works.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 118


Calculate the area (square metre) of the formwork required for a beam of 2 m span and cross section dimension of 400 mm $$\times$$ 200 mm.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 119


The cross section areas of three sections of an embankment at an interval of 40 m are 10 square metres, 15 square metres and 35 square metres. Calculate the quantity of earthwork for the embankment. Use prismoidal method.

SSC JE Civil Engineering 22nd Jan 2018 Shift-1 - Question 120


Calculate the annual depreciation (Rs.) of a machine having initial cost of Rs. 10,000. The scrap value is Rs. 1,000 and useful life of 30 years.