Time and Work Questions for SBI Clerk Set-2
Download SBI Clerk Time and Work Questions & Answers Set-2 PDF for SBI Clerk Prelims and Mains exam. Very Important SBI Clerk Time and Work Questions with solutions.
Download Time and Work Questions for SBI Clerk Set-2
105 SBI Clerk mocks for Rs. 199. Enroll here
Instructions
Study the table carefully to answer the question that follow:
Distance (in kms) travelled by six trucks on six different days of the week
Question 1:Â If the speed of truck P on Monday was 19.2 kmph, what was the time taken by it to cover the given distance?
a)Â 10 hours
b)Â 11 hours
c)Â 9 hours 30 minutes
d)Â 12 hours 30 minutes
e)Â None of these
Question 2:Â A truck covers a distance of 256 kms at the speed of 32 km/hr. What is the average speed of a car which travels a 160 kms more than the truck in the same time?
a)Â 46 km./hr.
b)Â 52 km./hr.
c)Â 49 km./hr.
d)Â 64 km./hr.
e)Â None of these
Question 3:Â Harish, Dilip and Asha start running around a circular stadium and complete one round in 27 s, 9 s and 36 s respectively. In how much time will they meet again at the same point?
a)Â 1 min 48 s
b)Â 2 min 36 s
c)Â 3 min 11 s
d)Â 2 min 25 s
e)Â None of these
Question 4:Â Riya Manasvi and Pintu start running around a circular stadium and complete one round in 24 s, 6 s and 14 s respectively. In how much time will they meet again at the starting point ?
a)Â 1 min 32 s
b)Â 4 min 8 s
c)Â 3 min 25 s
d)Â 2 min 48 s
e)Â None of these
Question 5:Â A tap can empty a tank in one hour. A second tap can empty it in 30 min If both the taps operate simultaneously, how much time is needed to empty the tank ?
a)Â 20 min
b)Â 30 min
c)Â 40 min
d)Â 45 min
e)Â None of these
Download SBI Clerk Previous Papers PDF
Question 6:Â 4 men can complete a piece of work in 2 days. 4 women can complete the same piece of work in 4 days whereas 5 children can complete the same piece of work in 4 days. If, 2 men, 4 women and 10 children work together, in how many days can the work be completed ?
a)Â 1 day
b)Â 3 days
c)Â 2 days
d)Â 4 days
e)Â None of these
Question 7:Â 6 men finish one-fourth work in 2 days. The number of additional men required for finishing the same work in 2 days is
a)Â 18 men
b)Â 24 men
c)Â 28 men
d)Â 14 men
e)Â None of these
Question 8:Â Work done by A in one day is half of the work done by B in one day Work done by B is half of the work done by C in one day If C alone can complete the work in 7 days in how many days can A B and C together complete the work ?
a)Â 28
b)Â 14
c)Â 4
d)Â 21
e)Â None of these
Question 9:Â 16 men can complete a piece of work in 7 days. In how many days will 28 men complete the same work ?
a)Â 6
b)Â 5
c)Â 8
d)Â 4
e)Â None of these
Question 10: 24 Men can complete a piece of work in 15 days. In how many days will 18 men complete that work ?
a)Â 16 days
b)Â 20 days
c)Â 22 days
d)Â 25 days
e)Â None of these
Answers & Solutions:
1) Answer (D)
Distance travelled by P on Monday = 240 km
Speed = 19.2 kmph
Speed = Distance/Time
Time = $\frac{240}{19.2} = 12.5$ hr
$\therefore$ P took 12 hr 30 minutes to cover the distance.
2) Answer (B)
Time taken by truck=time taken by car=distance/speed =256/32
Time taken = 8 hours.
Total distance travelled by car=256+160=416
Avg.speed=total distance/total time
=432/8 =52 km/hr
Option B is the right answer.
3) Answer (A)
Least common multipke of 36,27 and 9 is 108.
Hence Harish, Dilip and Asha will meet at 108 second i.e 1 minute and 48 seconds.
Therefore, the correct option is option A.
4) Answer (D)
The time of their meeting again can be calciulated by taking LCM of 24, 6 and 14.
LCM of 24, 6 and 14 = 168
Now, 168 seconds = 2 min 48 s.
Option D is correct.
5) Answer (A)
1 minute work of tap A = $\frac{1}{60}$
1 minute work of tap B = $\frac{1}{30}$
=> (A + B)’s 1 minute work = $\frac{1}{60} + \frac{1}{30}$
= $\frac{1 + 2}{60} = \frac{3}{60}$
= $\frac{1}{20}$
$\therefore$ Time taken by (A + B) to empty the tank = 20 min
105 SBI Clerk mocks for Rs. 199. Enroll here
15000 Free Banking Solved Questions
6) Answer (A)
Let us first get a relation between the work done by a man, woman and a child.
1 man can do a work in 4*2 = 8 days
1 woman can do the same work in 4*4 = 16 days
1 child can do the same work in 4*5 = 20 days
=> 1 man = 2.5 child and 1.25 woman = 0.8 child
2 men + 4 women + 10 children = 5 + 5 + 10 = 20 children
1 child takes 20 days to complete a work => 20 children will take 1 day to complete the same work.
7) Answer (A)
Time taken by 6 men to finish the whole work = 8 days
Let the number of men required be x.
Less days, more men (Inverse Proportion)
Days Men
8 6
2 x
â x =(8 * 6)/2 = 24 men
The additional men required = 24-6 men= 18 men
8) Answer (C)
Let the speed of work done by A, B and C be a, b and c.
Now, b=.5c, a=.5b=.25c
c does work in 7 days. It’s speed will be W/7. A’s speed will be .25W/7 and B’s speed will be .5W/7
Their combined speed is 1.75W/7
Time taken by them to complete the work = $\frac{W}{(1.75W/7)}$ = $\frac{7}{1.75}$= 4
Hence, together they will complete the work in 4 days.
Therefore, option C is correct.
9) Answer (D)
The number of days 16 men take to complete a piece of work is 7 days.
Hence, the number of days it takes 1 man to complete the piece of work is 7*16 = 112 days.
So, the number of days it takes 28 men to complete the piece of work is $\frac{112}{28} = 4$ days
10) Answer (B)
24 men can complete the work in 15 days.
So, 1 man can complete the work in 15*24 = 360 days.
Hence, 18 men can complete the work in $\frac{360}{18}=20$ days