Time and Work question and answers for Railway Exams PDF
Download Top-15 RRB Group-D Time and Work question and answers PDF. RRB Group – D Time and Work question and answers based on asked questions in previous exam papers very important for the Railway Group-D exam.
Download Time and Work question and answers for Railway Exams PDF
Download RRB Group-D Previous Papers PDF
Take a RRB Group-D free mock test
Question 1:Â A and B can complete a piece of work in 6 and 12 days separately. If they work jointly, how long will they take to complete this piece of work ?
a)Â 9 days
b)Â 18 days
c)Â 6 days
d)Â 4 days
Question 2:Â A certain job was assigned to a group of men to do in 20 days. But 12 men did not turn up for the job and the remaining men did the job in 32 days. The original number of men in the group was-
a)Â 32
b)Â 34
c)Â 36
d)Â 40
Question 3:Â A certain number of men can do a work in 60 days. If there were 8 men more, it could be finished in 10 days less. How many men were there in the begining ?
a)Â 40
b)Â 35
c)Â 45
d)Â 50
Question 4:Â 12 men and 18 boys working $ 7\frac{1}{2} $ hours a day can do a certain work in 60 days. If one man works equal to 2 boys, then the number of boys required to help 21 men to do twice the work in 50 days, working 9 hours a day, will be–
a)Â 30
b)Â 42
c)Â 48
d)Â 90
Question 5:Â In each castle, there is provision of food for 150 men for 50 days. After 20 days 50 men leave the castle. The remaining food will last for:
a)Â 40 days
b)Â 45 days
c)Â 42 days
d)Â 50 days
Question 6: Hari can do a piece of work in 30 days while giri can do the same work in 20 days working together they complete the work for which they are paid Rs 1000 in total.What is Hari’s share ?
a)Â Rs 400
b)Â Rs 500
c)Â Rs 600
d)Â Rs 300
RRB Group D previous year papers
Question 7:Â 12 men can do a piece of work in 10 days. How many men would be required to do the same work in 8 days ?
a)Â 14
b)Â 18
c)Â 16
d)Â 15
Question 8:Â A certain number of men can do a work in 60 days. If there were 8 men more it could be finished in 10 days less. How many men were there in the beginning ?
a)Â 40
b)Â 35
c)Â 45
d)Â 50
Question 9:Â 12 men and 18 boys working $7\frac{1}{2}$ hours a day can do a certain work in 60 days. If one man works equal to 2 boys. Then the number of boys required to help 21 men to do twice the work in 50 days, working 9 hours a day, will be
a)Â 30
b)Â 42
c)Â 48
d)Â 90
Question 10:Â 30 men working 5 hours a day can do a task in 16 days. In how many days will 40 men working 6 hours a day do the same task?
a)Â 12 days
b)Â 10 days
c)Â 15 days
d)Â 18 days
RRB Group D previous year papers
Question 11:Â Working together, P, Q and R reap a field in 6 days. If P can do it alone in 10 days and Q in 24 days, in how many days will R alone be able to reap the field?
a)Â 32 days
b)Â 40 days
c)Â 45 days
d)Â 60 days
Question 12:Â Working alone, A can do a job in 15 days and B can do the same job in 18 days. In how many days will the job be completed if both work together?
a)Â 10/3 days
b)Â 36/5 days
c)Â 5/36 days
d)Â 15 days
e)Â 90/11 days
Question 13:Â P is twice as efficient as Q. Q takes 12 days to complete a job. If both of them work together, how much time will they take to complete the job?
a)Â 6 days
b)Â 5 days
c)Â 4 days
d)Â 3 days
Question 14:Â Manju takes 16 days to complete a work. If she works with her friend Jenny they complete it in 12 days. How many days will it take for Jenny to complete the work alone?
a)Â 48
b)Â 32
c)Â 36
d)Â 24
Question 15:Â S can finish 50% of a work in a day. T can do 25% of the work in a day. Both of them together will finish the work in …. days.
a)Â 2.66
b)Â 2.33
c)Â 1.33
d)Â 1.67
RRB Group D previous year papers
Answers & Solutions:
1) Answer (D)
Time taken when they work together = $ \frac {1}{\frac{1}{6}+\frac{1}{12}}$
= 4 days
2) Answer (A)
Let there be x men initially. They were supposed to complete the work in 20 days.
When 12 men didn’t show up the work was done in 32 days
So, x- 12 men did the work in 32 days
But x-12 men were supposed to take 20x/ (x-12) days
So, 20 x/ (x-12) = 32
so,
x = 32
3) Answer (A)
Let there be x men in the group who can finish the work in 60 days.
X+ 8 men can finish the work in 50 days.
but x + 8 men take 60x/ (x+8) days
60x/ (x+8) = 50
So, x = 40
4) Answer (B)
2 boys = 1 man
So, 21 men can do work W is 60 days working 7.5 hours per day.
to do 2W, 42 men are needed.
To do the job in 50 days, 60 x 42 / 50 men are needed.
To do the job working 9 hours a day, 7.5/9 x 60 x42/50 men are needed
= 42 men
We only have 21 men so, we get 42 extra boys to get the work needed for the 21 extra men.
5) Answer (B)
Let the quantum of food be 1500 units.
Food lasts for 50 days for 150 men.
After 20 days, 2/5th of the food is over.
So, units of food left = 900
1500 units 50days 150 men
900units  ?days  100 men
? = 900/1500x50x 150/100 = 45 days
RRB Group-D Important Questions (download PDF)
General Science Notes for RRB Exams (PDF)
6) Answer (A)
Let the total units of work be 300.
Hari’s speed = 300/30 = 10 units/ day
Giri’s speed = 300/20 = 15 units/day
So, Hari’s share of the total amount = 1000* 10/25 = 400 Rs
7) Answer (D)
12 men can do a work in 10 days
How many men are needed to complete the work in 8 days
= 12 x 10 / 8 = 15
8) Answer (A)
Let there be m men originally to work in 60 days
If the men were m + 8, the work would be completed in 50 days.
(m+8)/m = 60/50
So, m = 40
9) Answer (B)
2 boys = 1 man
So, 21 men can do work W is 60 days working 7.5 hours per day.
to do 2W, 42 men are needed.
To do the job in 50 days, 60 x 42 / 50 men are needed.
To do the job working 9 hours a day, 7.5/9 x 60 x42/50 men are needed
= 42 men
We only have 21 men so, we get 42 extra boys to get the work needed for the 21 extra men.
10) Answer (B)
Let the required number of days be x.
A/c to question ,
$M_{1}T_{1}D_{1} =Â M_{2}T_{2}D_{2}$
$30 \times 5 \times 16 = 40 \times 6 \times x$
x = 10
So, the answer would be option b)10 days
11) Answer (B)
A/c to question ,
$\dfrac{1}{P} + \dfrac{1}{Q} + \dfrac{1}{R} = \dfrac{1}{6}$
$\dfrac{1}{10} + \dfrac{1}{24} + \dfrac{1}{R} = \dfrac{1}{6}$
$\dfrac{1}{R} = \dfrac{1}{6}-\dfrac{1}{10}-\dfrac{1}{24} = \dfrac{3}{120}$
$ \dfrac{1}{R} = \dfrac{1}{40}$
So, the answer would be option b)40 days
12) Answer (E)
A can do (1/15) part of job in 1 day.
and B can do (1/18) part of job in 1 day.
So,in 1 day they together can do
$(1/15)+(1/18)=(6+5)/90=11/90$
part of job.
So, they together can do full job in 90/11 days.
So,E is correct choice.
13) Answer (C)
P is twice efficient than Q.
It means that Q take 2 times of P’s time to complete the job.
So, P will take $\left(\frac{12}{2}\right)=6$ days to complete the job.
So, P can do 1/6 part of the job in 1 day and Q can do 1/12 part of the job in 1 day.
So,they together can do $\left(\frac{1}{6}+\frac{1}{12}\right)=\frac{3}{12}=\frac{1}{4}$ part of job in 1 day.
So, they together will take 4 days to complete the job.
C is correct choice.
14) Answer (A)
Manju does full job in 16 days.
In 1 day he will do $1/16$part of job.
Manju and Jenny together does full job in 12 days.
So,they together will do $1/12$ part of job in 1 day.
So, Alone Jenny will do $((1/12)-(1/16))$ or 1/48Â part of job in 1 day.
So,Jenny will finish the job in 48 days.
A is correct choice.
15) Answer (C)
“S can finish 50% of a work in a day” means S can complete work in $\frac{1}{2}$a day
“T can do 25% of the work in a day” means T can complete work in $\frac{1}{4}$ a day
both S and T can Complete the work in =$\frac{1}{2}$ +Â $\frac{1}{4}$ =Â $\frac{3}{4}$ a day
So they can complete the whole work in =Â $\frac{4}{3}$ days
DOWNLOAD APP FOR RRB FREE MOCKS
We hope this Time and Work question and answers PDF for RRB Group-D Exam will be highly useful for your preparation.